The procurement methods for a particular construction project is determined by certain factors such as speed, the quality expected, financing, risk, budget and specific project constraints. One of the causes of poor project performance is the use of inappropriate procurement methods and the use of appropriate procurement method is considered to result in the success of the project.
This particular procurement process will be important in the construction of low rise buildings residential buildings in Marrickville of approximately 60 and in this particular procurement method, the contractor will develop the design himself and after the design, the reviving of the design is done by the client and the contractor is requested to perform certain adjustments as per the aspects. Then the cost of construction and execution of the project is agreed upon. This process will be advantageous to the client since the client will not have to appoint the design consultant for the project. This particular method is also preferred in high rise buildings. The use of this method eradicates errors resulting from miscommunication since the project embraces collaboration which is the root of innovation and customization.
This method replaced the traditional method and in this process, the contractor, designer and the owner are working together as one team to meet the client or owner expectations. The members of the team are focusing on solving the problems and not blame games. The method allows the owner of the building only to manage a single contractor who in returns manages all the subcontractors and designer. Some of the five phases the design-build process entails include;
This particular procurement method will be of great advantage to the low rise buildings since the cost of the project will be established very early on in the process and this eliminates the risks of going over budget later during construction (Vilasini, 2011). The use of the design-build method is becoming popular in most parts of the world since it delivers high-quality projects thus people prefer it in the construction of high-quality commercial construction such as manufacturing facilities, sports venues, municipal facilities and office buildings. Some of the advantages associated with the design-build procurement method include the following;
In medium-rise residential development, management contracting appropriate in development of medium rise residential buildings consisting of 144 units in Marrickville and it is considered an approach whereby the client participate in the appointment of a management contractor. The client is expected to engage with the contractor to carry out an active role in the project at an early stage (Rahmani, 2017). The method is considered effective when pricing, time, flexibility and transparency are considered more important.
This method will help the client to reduce the risk associated with construction. The project will be divided into packages such that every package will have a contractor and this appointment is done at the design stage. The contractor is expected to participate in design development if the contractor is appointment in the design stages. The contract agreement is anticipated to include both the pre-contract doings and post contract doings (Chew, 2011). Some of the tasks and services provided by management contractor at the pre-contract stage if appointed at the contract stage include;
Task and services provided by the management contract at the post-contract stage include;
Management contractor is expected to be experienced and the general design is the obligation of the client specialists while the packages of the work are defined by the management contractor (Foward, 2014). Some of the benefits that will result from management contracting include;
This particular procurement method will be important in this particular project since it is considered a complex project since the project will be distributed into numerous sets. The subcontractors will be available during the construction of medium storey building and they will all be supervised by management contractors (Bebatunde, 2012). The owner is expected to converse with the management contractors and the client risks transferred to management contractors. This method is appropriate for complex projects such as for these medium rise residential buildings that will entail several subcontractors as shown below;
| Subcontractors | Skill speciality | Stages of construction involved in |
| Aqueduct plumbers | Works related to plumbing and sewage such as fixing faucets | The operation is carried out after the casting of floor slabs, after the completion of walling works and during the finishes for the kitchen and wet areas. |
| Electrical wiring | Electrical works | Electrical works are done after the completion of walling works |
| Hercules heating | Heating and air conditioning work. | After the completion of walling works and during the installation of ceiling and finishes. |
| Chic cabinetry | Carpentry design and installation of wooden furnishing. | During the finishes for areas requiring the wooden furnishings and fittings such as kitchen and washrooms. |
| Gary the gasfitter | Gasworks and installation of gas furnishings. | After the completion of the walling works. |
| Glistening glaziers | Glassworks | After the completion of the walling works. |
| Raucous roofers | Roof work | After the completion of the walling structures |
Bebatunde, S. (2012). An appraisal of project procurement methods in Australian construction industry. Civil engineering dimension, 14(2).
Chew, A. (2011). Delivery of ICT systems for hospital PPS in Australia. European procurement and public private partnership law review, 4(6), 180-188.
D, S. (2014). Procurement and distribution of radioisotopes in Australia. Medical journal of Australia, 25(1), 955-955.
Foward, R. (2014). Military manpower procurement in Australia. The Australian Quarterly, 42, 55.
Rahmani, F. (2017). An overview of construction procurement methods in Australia. Engineering, construction and architectural management, 24(4), 593-609.
Vilasini, N. (2011). Investigating degree of adoption effects on e-procurement benefits in Australia. International journal of construction management, 11(4), 65-78.
Looking for academic assignment samples online? Need professional paper writers to back you up with advanced resources and other addons? Here we are! MyAssignmenthelp.co.uk takes up the responsibility to provide you with the following backups every time, on the move.
So, now that you are aware of our potential and the numerous perks that we have got in store for you, take a smart call. Our assignment help services in the UK shall make sure to help you secure a straight A+ every semester.
Upload your Assignment and improve Your Grade
Boost Grades